The PERI UP Rosett modular scaffold allowed optimal adjustment to the complicated building geometry.

Aperçu du projet

Avec nos clients, nous réalisons de grandes choses. Qu'il s'agisse d'échafaudages, de gratte-ciel, de ponts ou de tunnels, nous vous montrerons les projets que nous avons réalisés avec nos clients.

Tous les projets

Thanks to the detailed planning provided by PERI engineers and high flexibility of the PERI balanced cantilever equipment, the superstructure of the cable stay bridge could be completed according to the schedule.
The 258 m long and 50 m high arched bridge crosses the Opamo Valley in the Bohemian Forest.
Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.
For the 1,083 m long Trmice motorway bridge near Aussig in the Czech Republic, 59 piers were cost-effectively formed using PERI formwork.
The southern entrance area was constructed using the cut-and-cover method for a length of around 1.5 km. With the two PERI formwork carriages, the walls and slabs of the two separate tunnels could be cost-effectively concreted in one pour.
Only when seen from an aerial perspective is the scale of the construction site really apparent: the area is the size of around 2,000 football pitches.
In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.
The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
The Midfield Terminal Complex is the ultimate in construction sites: in order to maintain the tight construction schedule, PERI planned and delivered the formwork and scaffolding systems, and has provided yet another convincing performance through the competent engineering service and provision of huge quantities of materials at short notice.
In 25 m long concreting steps and four cycle sequences, the tunnel bottom plate, two wall sections respectively and then the slab could be concreted one after the other.
Rabat-Iteen Interchange
The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.
PERI UP scaffolding on the longitudinal sides of the building was designed according to the expected loads and carried the construction loads.
The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
One of the two production lines with the formwork assemblies reaching a total weight of 1,150 t. Here the internal formwork has been retracted into the reinforcement cage.
Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.
In the area of the double piers, 14 complete ACS self-climbing units with telescopic working platforms were used.
PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.
A VARIOKIT cantilevered parapet carriage serves for constructing the external cantilevered parapets. The horizontal loads are transferred via friction, anchoring is not required.
Increased efficiency with optimized team capacity
With some supplementary system components, the VARIOKIT engineering construction kit can also be used for the balanced cantilever construction method. For the construction of the motorway bridge near Tarnow, the construction crew achieved a 4 to 5-day cycle thanks to the easy to use, mechanical solution. At the same time, the high requirements concerning the very small tolerances for the variable bridge cross-sections could be fulfilled.
Work could be safely carried out on the spacious and geometrically adapted working platforms of the PERI UP Rosett scaffold which was erected up to the head of the statue.
Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
The cantilevered working platform as seen from the visitors platform.
A total of 8,500 m² of exhibition space is now available under the three domes.
The almost 100 m long Libeskind-designed structure features a 30-metre high wedge tip made of glass and steel.
The LGS Weather Protection Roof on the basis of the PERI UP Scaffolding System made the roof renovation independent of the weather. The 90 m long protection roof consisted of 3 m wide and nearly 30 m long LGS segments.
Accelerated refurbishment project: the customized project solution was based on two compatible PERI modular construction systems – VARIOKIT and PERI UP.
For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.
With an X-shaped floor plan, the architectural concept of this building created a new highlight in the urban development of the city of Hradec Králové. Originally, all external surfaces should have received an orange-painted facade. This concept was completely rejected due to the high-quality concrete surface finish.
Built to coincide with “Porto 2001 – European Culture Capital”, the concert hall is pictured here after structural work had been completed.
The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.
A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
This extraordinary structure is characterized by twisting reinforced concrete walls which reach heights of up to 14 m.
The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
The execution of this very impressive project required unique engineering and assembly implementation on the construction site.
For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
The complex construction project with highest quality requirements demanded an experienced construction site team as well as on-site support through PERI engineers.
The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.
The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
With 77 t of PERI UP Rosett materials, the building´s design could be accurately realized as a three-dimensional spatial load-bearing structure.
The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.
With formwork and scaffolding systems perfectly matched each structural component, the concrete frame could be completely finished in only 9 months.
With the help of the PERI UP Rosett modular scaffold system, 24-metre high shoring was erected at the main entrance of the temple. Even at large heights, up to 40 kN per leg could be safely and reliably transferred.
With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
For the reconstruction of the Berlin City Palace, PERI supplied cost-effective formwork and scaffolding solutions from one source. Apart from short shuttering and moving times, the on-site support provided by the PERI engineers in particular ensured that the tight construction schedule could be maintained.
For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.
The challenging building form called for flexibly adaptable formwork and scaffolding systems.
Not far from Warsaw‘s city centre, the new headquarters building of the automotive group together with a Mercedes-Benz dealership containing showrooms and a service centre has been realized.
The three spectacular buildings of the new Zollhof complex in Dusseldorf during different stages of construction.
The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.
The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
The outside of the building resembles a medieval fortress. The facade is comprised of window openings as well as pre-determined regular tie points and horizontal pilaster strips.
The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin.
alrimal site Riyadh .
Strong and reliable support up to 14m high with PERI UP shoring system
SKY GARDEN
Through the planning and supply of formwork and scaffolding from one source, the MULTIFLEX slab formwork and PERI UP shoring could be perfectly matched.
Cost-effective PERI climbing concept: with a complete platform level and halved on-site wall formwork requirements, fast and continuous working operations were achieved.
The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
In the US state of Louisiana, three enormous liquid gas tanks were simultaneously realized using PERI know-how. Each of the structures has an 80 m diameter and a wall height of 44 m.
For the construction of the Bilbao Exhibition Centre, PERI engineers developed a practical movable falsework and formwork solution.
A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.
For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution.
Unique structure with no intermediate support
Easy to mount and move manually
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase. (Photo: IABG)
The RCS climbing protection panel complete encloses the upper floors under construction and provides protection against wind and weather - and increases productivity.
One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
The perfectly adapted shoring and working scaffold optimally supplemented the cost-effective formwork solution.
For the very wide range of requirements, PERI provided the most cost-effective solution with the ACS self-climbing formwork.
Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
For the construction of the Hotel Meliá in the La Défense office district, PERI developed a comprehensive climbing formwork solution. This serves not only as an enclosure, which ensures the safety of the construction teams at all times, but also it supports the precast parapets during erection.
Massive, 28 cm thick reinforced concrete balconies cantilever outwards for 3.35 m in an irregular fashion on all four sides of the building.
The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
Each of the two towers has three reinforced concrete cores which were constructed with help of two PERI ACS self-climbing variants.
The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
The PERI CPP climbing protection panel reliably encloses the upper floors under construction.
The cylindrical core and facade walls of this 142 m high office building were constructed with PERI ACS self-climbing technology.
With a height of 415 m, the Trump International Hotel and Tower on the Chicago River is a very impressive skyscraper.
With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.
Habtoor Residences project using PERI ACS Automatic Climbing System
The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.
The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.
More than 12 months after starting the development work on the Panama Canal, the dimensions and the massive structural elements are clearly visible.
The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.
Zahid Business Park
PERI supplied a project-specific formwork and scaffolding solution and supported with comprehensive engineering services for the construction of the 108-m-high complex dam on the River Tua in Portugal.
The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.