You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Langen Foundation, Germany

Données projet

Adresses: Neuss-Hombroich, Allemagne

Construction period until opening: until 2004

Architect: Tadao Ando Architect & Associates, Osaka, Japan

Exigences projet

  • predetermined plywood pattern
  • predefined quantity, position and distance of tie points
  • all corners with sharp edges
  • joint formation on equal areas, close formlining joints
  • use of SVB concrete with 100 kN/m² concrete pressure

Client

Florack GmbH, Bonn

Avantages pour le client

  • outstanding concrete result
  • no visible joint off-set
Langen Foundation, Statement: Thomas Schieren, Foreman structural engineering
Thomas Schieren
Foreman structural engineering

As we of course expected, we were able to achieve an excellent concrete result with the PERI formwork solution. We have been working with PERI for 20 years now and it has always served us well.

Solutions PERI

  • VARIO GT 24 girder wall formwork with a special panel format screwed at the back
  • VARIO GT 24 girder wall formwork elements with 190 cm x 90 cm formwork panel and optically required six tie points per panel, partly as blind plug
  • utilisation of the fair-faced concrete coupling to reduce the joint off-set

Systèmes PERI en utilisation