![Forum roof Munich Airport - Maximum safety was ensured Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.](https://cdn.peri.cloud/.imaging/mWide/dam/7012858e-97d1-4bb0-9e05-5a08fe9956e6/47582/forum-roof-munich-airport-maximum-safety-was-ensured.jpg)
Toit du Forum de l'aéroport de Munich
Munich Airport, Allemagne
Avec 10 000 m², l'un des plus grands espaces couverts d'Europe
Le projet
Impressions sur le processus de projet
Le remplacement de la membrane a été effectué pendant les opérations quotidiennes de l'aéroport. Une sécurité maximale a été assurée grâce à la construction d'un toit de protection de grande surface installé à la hauteur de la zone du forum, en plus du filet de sécurité placé sous les sections du toit montées sur échafaudage.
L'échafaudage PERI UP a été fixé aux membrures du toit en forme de losange par l'intermédiaire d'un ensemble de suspension spécialement conçu par PERI pour ce projet.
L'assemblage de la membrane a été réalisé à une hauteur de 40 m pendant les opérations quotidiennes de l'aéroport.
![Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.](https://cdn.peri.cloud/.imaging/mWide/dam/7012858e-97d1-4bb0-9e05-5a08fe9956e6/47582/forum-roof-munich-airport-maximum-safety-was-ensured.jpg)
![Forum roof Munich Airport - Maximum safety was ensured Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.](https://cdn.peri.cloud/.imaging/mWide/dam/7012858e-97d1-4bb0-9e05-5a08fe9956e6/47582/forum-roof-munich-airport-maximum-safety-was-ensured.jpg)
![Forum roof Munich Airport, Germany - The PERI UP scaffold construction was fixed to the rhomboid-shaped roof members via a suspension assembly specially developed by PERI for this project.](https://cdn.peri.cloud/.imaging/mWide/dam/fa952acc-9f4f-4a66-901f-bf4c438299ea/47576/forum-roof-munich-airport-peri-up-scaffold-construction.jpg)
![Forum roof Munich Airport - PERI UP scaffold construction Forum roof Munich Airport, Germany - The PERI UP scaffold construction was fixed to the rhomboid-shaped roof members via a suspension assembly specially developed by PERI for this project.](https://cdn.peri.cloud/.imaging/mWide/dam/fa952acc-9f4f-4a66-901f-bf4c438299ea/47576/forum-roof-munich-airport-peri-up-scaffold-construction.jpg)
![Forum roof Munich Airport, Germany - The membrane assembly was carried out at a height of 40 m during ongoing daily airport operations.](https://cdn.peri.cloud/.imaging/mWide/dam/582a958e-ff82-47a1-a51c-e44ff821472e/47577/forum-roof-munich-airport-membrane-assembly-at-a-height-of-40-m.jpg)
![Forum roof Munich Airport - membrane assembly at a height of 40 m Forum roof Munich Airport, Germany - The membrane assembly was carried out at a height of 40 m during ongoing daily airport operations.](https://cdn.peri.cloud/.imaging/mWide/dam/582a958e-ff82-47a1-a51c-e44ff821472e/47577/forum-roof-munich-airport-membrane-assembly-at-a-height-of-40-m.jpg)
![Forum roof Munich Airport - Maximum safety was ensured Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.](https://cdn.peri.cloud/.imaging/mWide/dam/7012858e-97d1-4bb0-9e05-5a08fe9956e6/47582/forum-roof-munich-airport-maximum-safety-was-ensured.jpg)
Le remplacement de la membrane a été effectué pendant les opérations quotidiennes de l'aéroport. Une sécurité maximale a été assurée grâce à la construction d'un toit de protection de grande surface installé à la hauteur de la zone du forum, en plus du filet de sécurité placé sous les sections du toit montées sur échafaudage.
![Forum roof Munich Airport - PERI UP scaffold construction Forum roof Munich Airport, Germany - The PERI UP scaffold construction was fixed to the rhomboid-shaped roof members via a suspension assembly specially developed by PERI for this project.](https://cdn.peri.cloud/.imaging/mWide/dam/fa952acc-9f4f-4a66-901f-bf4c438299ea/47576/forum-roof-munich-airport-peri-up-scaffold-construction.jpg)
L'échafaudage PERI UP a été fixé aux membrures du toit en forme de losange par l'intermédiaire d'un ensemble de suspension spécialement conçu par PERI pour ce projet.
![Forum roof Munich Airport - membrane assembly at a height of 40 m Forum roof Munich Airport, Germany - The membrane assembly was carried out at a height of 40 m during ongoing daily airport operations.](https://cdn.peri.cloud/.imaging/mWide/dam/582a958e-ff82-47a1-a51c-e44ff821472e/47577/forum-roof-munich-airport-membrane-assembly-at-a-height-of-40-m.jpg)
L'assemblage de la membrane a été réalisé à une hauteur de 40 m pendant les opérations quotidiennes de l'aéroport.
Informations sur le projet